ALR4 under construction
ALR4 in MARS workshop
ALR1500 vehicles in their early stages of construction
ALR6 undergoes commissioning trials at Loch Ness
ALR 1500 being lifted out of the water
ALR4 in the water
ALR in the water
Sensors
ALR 1500 in workshop
A2KUI (closest to camera) in the workshop alongside Autosub 6000 and the ISIS ROV.
A2KUI In the ballasting tank undergoing in-water testing
A2KUI being prepared for trials by NOC engineers
A2KUI being winched into Loch Ness
ALR being winched into Loch Ness
A2KUI in Loch Ness getting ready for its first mission
A2KUI heading out into Loch Ness
C2 being used to pilot an ALR mission